Production Process Model (PPM): Settings for CTM

If you create a PPM for Capable-to-Match (CTM), note that CTM does not support setup matrices or teardown activities.

CTM does not use all settings from the PPM. This table lists the settings that CTM does use:

Screen/tab page

In this field...

Initial screen

· Plan number

· Use

Plan

· Multilevel Costs (Fixed)

· Status

Operations

· Operation

· Description

· Operation type

Activities

· Activity number

· Description

· Activity category

· Scrap in percent (time and version dependent)

Logical components (only PP/DS PPM)

· Description

· Input/output

Alternative components

· Product

· Input/output indicator (only SNP PPM)

· Storage

· Date from

· Date to

· Unit of measure

· Material consumption (variable)

· Material consumption (fixed)

· Time-dependent data

· Prevention of product explosion

Modes

· Mode

· Mode Priority

· Primary Resource

· Location

· Unit of measure (in the case of SNP PPM: only Day is allowed)

· Duration (variable)

· Duration (fixed)

· Time-dependent data

· Break not allowed

· Break without interruption

Resources

· Resource

· Location

· UoM for continuous consumption

· Continuous consumption (variable)

· Continuous consumption (fixed)

· UoM for bucket consumption

· Bucket consumption (variable)

· Bucket consumption (fixed)

· Time-dependent duration

Activity Relationships ® Predecessor/Successor

· Operation name

· Activity number

· Reference type (only end-start)

· Unit of measure

· Usage min.

· Process-related minimum interval

· Usage max.

· Maximum interval

· Mode linkage (only via primary resources)

Product-plan assignment

· PPM name and description

· Validity (date/time)

· Planning location

· Production location

· Minimum and Maximum Lot Size

· Procurement Priority