Monday, April 29, 2019

Planning Areas used in IBP Time-series based planning And Order-based planning


SAP2, SAP4(C), SAP6, SAP3, SAP5, SAP7 are standard SAP delivered sample planning areas.


Sunday, April 28, 2019

IBP - Things to consider regarding Co-products in Production Source of supply

Things to consider regarding Co-products in Production Source of supply

Optimizer


The optimizer doesn’t distinguish between the main output product and co-products. If overall costs allow, the production source for the main product will also be used to satisfy the demand for co-products.

Lot Sizing

Lot-size parameters (for example, to define minimum and/or maximum lot size) aren't available for co-products. You can only specify them for the main (output) product.