SCM Planning Solutions IBP APO Ariba
Saturday, March 5, 2011
Determination of the Requirement class in ECC
That check mode in APO product master is not relevant when the ATP check is called from R3 side. When it's called from R3 side, Requirement class is transferred to APO as the check mode at that moment for the ATP checking.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)